Robina Town Centre
To date, 13,000 m3 of concrete have been dosed with Xypex Admix C-2000, including the exposed deck and walls, and fire service tanks. Xypex Concentrate slurry has been used along with Xypex Dry-Pac in the joints. This project is ongoing with plans for Xypex to be used in the sewage treatment plank and rail link to Brisbane.


